Then Side Two was delivered.
And then there were two:

Setting out the foundation pads.
Getting ready to removed plastic sheets protecting the interior.
Rolling the two sides to join.
And then they were one.
And then it rained.
Note the wind damage to roof. Interesting that Skyline doesn't put a strip on the front edge to protect from wind damage during transport.
The tow bars pulled out and ready for us to stow.
Then there was the Septic, the water, the electricity, and digging one more trench for the propane.
And that was May...............
June to come.
/joB
>>>>>>>>>>>>>>>>>>>>>>>>>